Road trip · Muffin!
Art Show Delivery
– · 1 day · 9 drives · 3 charging stops
- Distance
- 188mi
- Efficiency
- 3.79mi/kWh
- Cost per mi
- $0.06
- Driving
- 4.0h
Route
For privacy, not shown near saved places; DC fast stops only
DC fast Level 2
Elevation
ft above sea level
660 ft978 ftTerrain shown 1.5× taller
Driving
Energy used
50kWh
Net of regen
Average speed
47mph
While moving
Descended
22ft
1,469 ft up · 1,492 ft down
Outside
55°F – 85°F
Coldest to warmest
Charging
Charging stops
3
1 DC fast · 2 Level 2
Energy added
56kWh
Peak 211 kW
Time charging
4.4h
Plugged in and charging
Avg DC fast charge
3m
Over 1 DC fast stop
Between fast charges
—
Needs two DC fast stops
Energy cost
$11.86
At what each charge cost · $9.66 paid at stops
Itinerary
Every drive and charging stop, in order
- Charged, 0.8 kWh at Home
4 min · 79% → 80% · peak 12 kW · $0.09
- Drove 5.0 mi
12 min · 3.64 mi/kWh · avg 24 mph · 78% → 77%
- Drove 5.0 mi
18 min · 3.14 mi/kWh · avg 16 mph · 75% → 73%
- Drove 1.6 mi
4 min · 2.18 mi/kWh · avg 22 mph · 73% → 72%
- Drove 84.8 mi
1 h 25 min · 4.17 mi/kWh · avg 60 mph · 72% → 41%
- Drove 0.8 mi
5 min · 2.58 mi/kWh · avg 10 mph · 41% → 41%
- Drove 38.6 mi
50 min · 3.39 mi/kWh · avg 47 mph · 40% → 23%
- DC fast charge, 7.7 kWh
3 min · 23% → 33% · peak 211 kW · $4.29
- Drove 0.9 mi
3 min · 5.25 mi/kWh · avg 20 mph · 33% → 35%
- Drove 46.7 mi
55 min · 3.68 mi/kWh · avg 51 mph · 35% → 17%
- Drove 4.7 mi
10 min · 4.36 mi/kWh · avg 29 mph · 17% → 15%
- Charged, 48.0 kWh at Home
4 h 17 min · 15% → 80% · peak 12 kW · $5.28