PlugLogTrack your EV with PlugLog
← Bobbie's EV log

Road trip · 2026 Chevrolet BT1CC with Blue Cargo in tow

ISSMA State Finals

– · 2 days · 5 drives · 3 charging stops

Distance
271mi
Efficiency
0.80mi/kWh
Cost per mi
$0.38
Driving
5.5h

Route

For privacy, not shown near saved places; DC fast stops only

DC fast Level 2

Elevation

ft above sea level

528 ft826 ftTerrain shown 1.5× taller

Driving

Energy used
337kWh
Net of regen
Average speed
50mph
While moving
Climbed
26ft
2,845 ft up · 2,820 ft down
Outside
34°F – 56°F
Coldest to warmest

Charging

Charging stops
3
2 DC fast · 1 Level 2
Energy added
305kWh
Peak 178 kW
Time charging
14.7h
Plugged in and charging
Avg DC fast charge
40m
Over 2 DC fast stops
Between fast charges
68mi (1h 43m)
Driving, on average, over 1 stretch
Energy cost
$102.06
At what each charge cost · $94.18 paid at stops

Itinerary

Every drive and charging stop, in order

  1. Drove 126.4 mi

    2 h 08 min · 0.78 mi/kWh · avg 60 mph · 98% → 17%

  2. DC fast charge, 72.1 kWh

    41 min · 18% → 53% · peak 114 kW · $36.59

  3. Drove 5.5 mi

    26 min · 1.15 mi/kWh · avg 21 mph · 53% → 52%

  4. Drove 62.2 mi

    1 h 17 min · 0.79 mi/kWh · avg 54 mph · 50% → 11%

  5. DC fast charge, 92.7 kWh

    39 min · 11% → 56% · peak 178 kW · $42.12

  6. Drove 67.6 mi

    1 h 16 min · 0.77 mi/kWh · avg 54 mph · 56% → 12%

  7. Drove 9.1 mi

    20 min · 2.27 mi/kWh · avg 30 mph · 13% → 11%

  8. Charged, 140.6 kWh at Home

    13 h 21 min · 11% → 80% · peak 11 kW · $15.47