PlugLogTrack your EV with PlugLog
← Bobbie's EV log

Road trip · 2026 Chevrolet BT1CC

Hocking Hills State Park

– · 1 day · 7 drives · 2 charging stops · 25 photos & videos

Distance
533mi
Efficiency
1.91mi/kWh
Cost per mi
$0.15
Driving
9.5h

Route

For privacy, not shown near saved places; DC fast stops only

DC fast Level 2

Elevation

ft above sea level

608 ft1,374 ftTerrain shown 1.5× taller

Driving

Energy used
278kWh
Net of regen
Average speed
56mph
While moving
Climbed
68ft
6,241 ft up · 6,173 ft down
Outside
65°F – 79°F
Coldest to warmest

Charging

Charging stops
2
2 DC fast · 0 Level 2
Energy added
184kWh
Peak 349 kW
Time charging
48min
Plugged in and charging
Avg DC fast charge
24m
Over 2 DC fast stops
Between fast charges
202mi (3h 48m)
Driving, on average, over 1 stretch
Energy cost
$82.43
At what each charge cost · $79.04 paid at stops

Itinerary

Every drive and charging stop, in order

  1. Drove 1.0 mi

    3 min · 2.14 mi/kWh · avg 25 mph · 80% → 80%

  2. Drove 3.7 mi

    12 min · 2.44 mi/kWh · avg 32 mph · 80% → 79%

  3. Drove 216.8 mi

    3 h 30 min · 1.89 mi/kWh · avg 65 mph · 79% → 21%

  4. DC fast charge, 120.5 kWh

    33 min · 21% → 80% · peak 349 kW · $51.86

  5. Drove 50.1 mi

    1 h 18 min · 1.81 mi/kWh · avg 53 mph · 80% → 66%

  6. Drove 0.1 mi

    1 min · avg 11 mph · 66% → 66%

  7. Drove 152.0 mi

    2 h 28 min · 1.97 mi/kWh · avg 64 mph · 66% → 27%

  8. DC fast charge, 63.2 kWh

    15 min · 27% → 58% · peak 336 kW · $27.18

  9. Drove 109.1 mi

    1 h 55 min · 1.92 mi/kWh · avg 63 mph · 58% → 30%